Coming together is a beginning; keeping together is progress; working together is success.
| Place of Origin: | Dongguan,China |
| Brand Name: | HYD |
| Certification: | CE |
| Model Number: | RJC206 |
| Minimum Order Quantity: | 1 Set |
|---|---|
| Price: | Negotiable |
| Packaging Details: | Standard Seaworthy Plywood Case |
| Delivery Time: | 30 Days |
| Payment Terms: | Negotiable |
| Supply Ability: | 20 Sets Per Month |
| Wire Diameter: | 0.1-3.0mm | Power: | 6KW |
|---|---|---|---|
| Tempering Time: | 1.5-20 Min | Max Temperature: | 500°C |
| Furnace Body Weight: | 200KG | Furnance Dimension: | 1600*750*1300mm |
| Highlight: | normalizing furnace,hardening tempering furnace,Hot Wind Steel Tempering Furnace |
||
6KW Power Hot-wind Tempering Furnace for Wire Diameter 0.1-3mm
HYD Service:
1. The HYD production base offers free training.video of the machine in action will be supplied for verification.
2. The expert and considerate consulting service will assist you in determining the best course of action.
3. Fast and secure delivery in accordance with your specifications, including the reservation, container loading, and shipping paperwork.
4. HYD offers technical assistance via phone and email, and professionals are always hand to assist you whenever needed.
5. During the one-year guarantee term, spare parts will be provided without charge; after that, the original cost will apply.
FAQ
1. Q: What information will be helping to get an accurate quotation from us?
A: The customer should provide the related drawings, pictures, industrial voltage, planned output, technical requirements, etc
2. Q: What is the power supply of the machine?
A: The standard power supply in China is 380V, 3P, 50Hz. We also can customized as per requirement.
3. Q: What is the payment term
A: The payment term is 30% deposit as PO confirmation ,and 70% should be finished before the shipment.We also accept other payment term.
4 Q: What is the delivery time?
A: Normally the manufacturing time of the machine is 30 days after receiving deposit.But it depends on machine model.Some machine production can be finished within 15 days.
5. Q: What is the guarantee period of the machine?
A: The guarantee period is one year from the date of B/L.
![]()
Contact Person: zoey