Coming together is a beginning; keeping together is progress; working together is success.
| Place of Origin: | Dongguan,China |
| Brand Name: | HYD |
| Certification: | CE / IS09001 |
| Model Number: | HYD-212 |
| Minimum Order Quantity: | 1 Set |
|---|---|
| Price: | Negotiable |
| Packaging Details: | Standard Seaworthy Plywood Case |
| Delivery Time: | 25 Days |
| Payment Terms: | Negotiable |
| Wire Size Range: | 0.3-1.2mm | Axis: | Two Axes |
|---|---|---|---|
| Additional Tools: | Spring Length Gauge.tosion Attachement | Servo Motor: | Japan Brand |
| Payment Term: | T/T | Guarantee Period: | One Year |
| Port: | Shenzhen,China | Production Capacity: | 30 Sets One Month |
| Highlight: | spring manufacturing machine,cnc spring forming machine,Two Axes Spring Manufacturing Machine |
||
Two Axes CNC Spring Manufacturing Coiling Ring Machine From Factory
| HYD-212 Compression Spring Machine Parameters | |
| Model | HYD-212 |
| Diameter | 0.3-1.2mm |
| Maximum diameter | 20mm |
| The fastest production speed | 550pcs/min |
| Wire feeding length | Unlimited |
| Wire feeding speed | 1200m/min |
| Delivery spools | Y Axis 1kw |
| Camshaft | X Axis 1kw |
| Screen display | Color/Chinese/English |
| Minimum order value | X:0.1 Y:0.01mm |
| Machine size | 900×850×1600mm |
| Machine weight | 400kg |
| Power | 220V3p50/60HZ |
![]()
Why us
• Independent R&D ability
• 15 years experience in spring machine industry
• Quick and patient reply for Bfore&After sale service
• Tranning in factory is available,spring set-up in machine for shipment
FAQ
1. Q: What information will be helping to get an accurate quotation from us?
A: The customer should provide the related drawings, pictures, industrial voltage, planned output, technical requirements, etc
2. Q: What is the power supply of the machine?
A: The standard power supply in China is 380V, 3P, 50Hz. We also can customized as per requirement.
3. Q: What is the payment term
A: The payment term is 30% deposit as PO confirmation ,and 70% should be finished before the shipment.We also accept other payment term.
4 Q: What is the delivery time?
A: Normally the manufacturing time of the machine is 30 days after receiving deposit.But it depends on machine model.Some machine production can be finished within 15 days.
5. Q: What is the guarantee period of the machine?
A: The guarantee period is one year from the date of B/L.
Contact Person: zoey