Coming together is a beginning; keeping together is progress; working together is success.
Place of Origin: | China |
Brand Name: | HYD |
Certification: | CE |
Model Number: | MF-12A-80 |
Minimum Order Quantity: | 1 sets |
---|---|
Price: | USD 60000-68000/sets FOB Shenzhen |
Packaging Details: | Wooden case |
Delivery Time: | 5-10 days |
Payment Terms: | L/C, T/T, Western Union, MoneyGram |
Supply Ability: | 5 sets/ 2 months |
Wire Size: | 2-6mm | Servo Motors: | 8-15 |
---|---|---|---|
Motor Brand: | Sanyo Denki/ Yaskawa | Function: | Double Head Forming |
Min. Wire Feed: | 0.01mm | Max. Wire FEED Speed: | >60m/min |
Highlight: | Chamfering Forms Wire Bending Machine,Multi-function Wire Bending Machine,3D Wire Bending Equipment Machine |
Multi-function 3D Wire Bending Equipment Machine for Chamfering Forms
1. FEATURES AND APPLICATIONS:
* A brand-new, rotating, multipurpose 3D wire bending machine.
* More readily straightened and more stable.
*After cutting the wire, the robot grabs it and bends it twice. This double-bending function is perfect for small, intricately-shaped wire objects.
*It is widely used in many different industries, such as pet cages, auto parts, shelving, hardware, grocery carts, kitchen and bathroom, and storage cages.
2. SPECIFICATION:
Model | MF12A-60 | MF12A-80 |
Wire size mm | 2.0-6.0 TS<500N | 2.0-8.0 TS<500N |
Servo motors | 8-15 | 8-15 |
Control system | CNC | CNC |
Motor brand | Sanyo/ Yaskawa | Sanyo/ Yaskawa |
Max. wire feed mm | 10000.00 | 10000.00 |
Min. wire feed mm | 0.01 | 0.01 |
Max. Wire feed speed | 60m/min | 60m/min |
Power | 3 phase, 380V | 3 phase, 380V |
Pressure kg/cm2 | 5-6 | 5-6 |
3. Left and right offset of head
*It can be bent and generated on a single occasion; it is not necessary to bend it below R30 repeatedly. enhanced stability and efficiency.
*Enhanced functionality, increased adaptability, and 30% superior performance compared to an 8-axis machine.
Hot Sales
FAQ
Q1: What information will be helping to get an accurate quotation from us?
A1: The customer should provide the related drawings, pictures, industrial voltage, planned output, technical requirements, etc
Q2: What is the payment term
A2: The payment term is 30% deposit as PO confirmation ,and 70% should be finished before the shipment.We also accept other payment term.
Q3: What is the guarantee period of the machine?
A3: The guarantee period is one year from the date of B/L.
Q4: Can it be configured with something else?
A4: Yes, it can be optional double-head chamfering or single-head chamfering.
Feel free to contact us for more details.
Contact Person: zoey