Coming together is a beginning; keeping together is progress; working together is success.
Place of Origin: | Dongguan,China |
Brand Name: | HYD |
Certification: | CE / IS09001 |
Model Number: | 200KG |
Minimum Order Quantity: | 1 Set |
---|---|
Price: | Negotiable |
Packaging Details: | Standard Seaworthy Plywood Case |
Delivery Time: | 10 days |
Payment Terms: | Negotiable |
Supply Ability: | 50 pcs per month |
Model: | 200 KG Decoiler | Equipment Painting: | Blue |
---|---|---|---|
Diameter Of Plate: | 1100mm | Equipment Size: | 1100*1100*700mm |
High Light: | spring end grinding machine,spring end grinder,High Effective Wire Decoiler Equipment |
Loading wire feeder with high effectiveness, 60 kg to 1000 kg wire decoiler equipment
1. FEATURES AND APPLICATIONS:
*Automatic Auxiliary Equipment 200KG Loading Wire Feeder for HYD-40T-3A
*HYD could provide 60KG,100KG,200KG,500KG,1000KG decoiler for additional purchasing.
2. SPECIFICATION:
Model | 200 KG decoiler |
Equipment Painting | Blue |
Diameter of Plate | 1100mm |
Equipment Size | 1100*1100*700mm |
3.HYD Service:
1.There is free training available at the HYD production base.Prior to shipment, images and a video showing the machine in action will be supplied for verification.
2. The patient and knowledgeable consulting service will assist you in determining the best course of action.
3. A prompt and secure shipment that complies with your needs, including shipping documentation, booking, and container loading.
4. HYD offers phone and email technical assistance, with professionals on hand to assist you whenever needed.
5. Original cost will apply to spare parts after the one-year guarantee term, after which they will be freely supplied.
4.FAQ
1. Q: What information will be helping to get an accurate quotation from us?
A: The customer should provide the related drawings, pictures, industrial voltage, planned output, technical requirements, etc
2. Q: What is the power supply of the machine?
A: The standard power supply in China is 380V, 3P, 50Hz. We also can customized as per requirement.
3. Q: What is the guarantee period of the machine?
A: The guarantee period is one year from the date of B/L.
4. Q: What is the payment term
A: The payment term is 30% deposit as PO confirmation ,and 70% should be finished before the shipment.We also accept other payment term.
5 Q: What is the delivery time?
A: Normally the manufacturing time of the machine is 30 days after receiving deposit.But it depends on machine model.Some machine production can be finished within 15 days.
6. Q: What is the guarantee period of the machine?
A: The guarantee period is one year from the date of B/L.
Contact Person: zoey